Farewell, faithful timetable!

Under the new Northern franchise responsibility for producing timetable booklets “passes to the franchisee”. So, from this December timetable, the familiar West Yorkshire Metro A6-size booklets for “Calder Valley Line” and other routes will be replaced by Northern booklets. The all-county combined volume will, we understand, be no more. Avoiding duplication is one thing. But we say Northern needs to improve significantly on its current booklets. At present the company shows York-Blackpool and Leeds-Manchester trains in separate tables, and some local Northern trains on our line are not shown in any Northern booklet at all—that includes  more than half the trains serving Brighouse! Metro officers at West Yorkshire Combined Authority have been working with Northern “to ensure local rail passenger needs are maintained”. The booklet for any route must surely include all operators’ services, meaning Grand Central and the rest as well as Northern itself. We have expressed our concerns with both Northern and WYCA, and await the new booklets with nervous interest. The all-county timetable will be greatly missed by those who travel widely about West Yorkshire. We might even be prepared to pay a cover price for a wider regional volume. How about it?

 

Advertisements

Sowerby Bridge: reasonable, achievable demands!

Many of the trains that do not stop at Sowerby Bridge have the same timing Hebden Bridge to Halifax as ones that do stop. The non-stoppers often have a couple of minutes “performance allowance” in the schedule. In theory most if not all could all stop, but don’t because of “performance risk”. This service has to hit time slots over complex junctions at Preston, Leeds and York, so the train operator wants some slack in the timings to meet punctuality targets. We understand that. But in our report we also say the new timetable to be introduced at the end of 2017 could and should be designed so that all the Blackpool-York expresses do serve Sowerby Bridge. This has been half-promised in the past and it’s time to deliver. We also think a few more of these trains could serve Mytholmroyd.

By 2019 there will be an extra train every hour on weekdays between Bradford and Manchester—through to the Airport. We say this should also serve Sowerby Bridge.

These reasonable, achievable proposals would double daytime service frequency at Sowerby Bridge during the week, responding to clear latent demand. ORR figures show passengers at Sowerby Bridge increased by 115% between 2006/7 and 2014/15, beating all other Calder Valley Line stations apart from Brighouse.