43 Years of West Yorkshire Station Openings

Kirkstall Forge station opened in June to serve a major business and residential development in the Aire Valley and has an hourly service mainly of  Ilkley trains. It surely goes without saying that this frequency must be increased. The screens  were not working when we called but the ticket machine gave train running information.

Up the valley Apperley Bridge opened last December with half-hourly Bradford Forster Square and Leeds trains, very much a park & ride with a new access road off the A658. It felt like a trek from the village on foot but a full 100-space car park was evidence of success. Apperley Bg has ramped access to the platforms (KLF has lifts).

West Yorkshire new and reopened stations go back 43 years to the opening of Baildon station way back in January 1973, actually a year before WY “Metro” came into being. Two members of the crowd for the first train later became early HADRAG members! Baildon is between Guiseley and Shipley served by half-hourly Ilkley-Bradford electric trains on the Wharfedale Line

Elland next!

Brighouse opened in May 2000 of course. And with Low Moor now under construction we are increasingly optimistic the county’s next new station could be at Elland. 

 

Better Rail Deal

The unloved”Pacer”at Brighouse will be gone by 2019.  What will replace it? Great news that under the new Arriva franchise most Calderdale stations will see brand new trains on “Northern Connect”services to York, Blackpool, Liverpool, Chester and Manchester Airport. But it looks like Northern Connect will bypass Brighouse. On the plus side,
Leeds-Brighouse-Manchester stopping trains are expected to be extended to Southport and should get millennium-vintage “Turbostar”trains in 2-3 years time. The promise is that everything not new will be refurbished to top modern quality with free wi-fi, and improved access and toilets. Expect 30 year-old”Sprinters”looking like new-it’s not impossible!

HADRAG, the group that fought to get brighouse station reopened 16 years ago has released a report advocating a better deal. Capacity around Huddersfield and Mirfield prevents new operator Arriva from increasing services along the Brighouse line. But HADRAG says the Manchester trains should be speeded up as”semi-fasts”exploiting Turbostar performance. Longer term we want track authority Network Rail to build in extra capacity as it electrifies the Huddersfield line so that more trains can run through Brighouse to Huddersfield, Mirfield and beyond. HADRAG has always said a fast Brighouse-Mirfield-Leeds train could cut journey time from 35 to 20 minutes. And the Brighouse Line timetable must be designed to include stops at planned Elland station.

Sowerby Bridge also has a good case for more trains. HADRAG argues all York-Blackpool”Northern Connects” should stop there, plus the extra Manchester-Bradford trains due to start in 2019. We believe our ideas are sensible and achievable. And we believe Arriva, Rail North and the other “powers that be”are listening to us.