Calder Valley Connections

Mytholmroyd (in picture) and Sowerby Bridge should be getting all York-Blackpool trains stopping when the May 2018 timetable plan is implemented (which may not be May 2018!). Worryingly, however, both stations were threatened in the draft timetable with losing Sunday services to/from Manchester as well as late night trains back in the week—unintended consequences of the service specification in the franchise agreement. We are more hopeful Sowerby Bridge will see improvement by December 2019 when the “Northern Connect” regional express brand is launched. Sowerby Bridge is to be an NC-designated station, and we are told all NC trains should stop there even though this would go beyond the franchise specification. We’ve asked Northern to clarify their intentions and we’ll let you know!

Northern Connect stations will also get “full staffing”, which is starting to sound something like a proper booking office. Mytholmroyd and Brighouse are meant to get for partial staffing, the meaning of which will doubtless become clear. When its big new car park is complete Northern may discover that Mytholmroyd needs more trains! Brighouse certainly deserves better.

 

Better Rail Deal

The unloved”Pacer”at Brighouse will be gone by 2019.  What will replace it? Great news that under the new Arriva franchise most Calderdale stations will see brand new trains on “Northern Connect”services to York, Blackpool, Liverpool, Chester and Manchester Airport. But it looks like Northern Connect will bypass Brighouse. On the plus side,
Leeds-Brighouse-Manchester stopping trains are expected to be extended to Southport and should get millennium-vintage “Turbostar”trains in 2-3 years time. The promise is that everything not new will be refurbished to top modern quality with free wi-fi, and improved access and toilets. Expect 30 year-old”Sprinters”looking like new-it’s not impossible!

HADRAG, the group that fought to get brighouse station reopened 16 years ago has released a report advocating a better deal. Capacity around Huddersfield and Mirfield prevents new operator Arriva from increasing services along the Brighouse line. But HADRAG says the Manchester trains should be speeded up as”semi-fasts”exploiting Turbostar performance. Longer term we want track authority Network Rail to build in extra capacity as it electrifies the Huddersfield line so that more trains can run through Brighouse to Huddersfield, Mirfield and beyond. HADRAG has always said a fast Brighouse-Mirfield-Leeds train could cut journey time from 35 to 20 minutes. And the Brighouse Line timetable must be designed to include stops at planned Elland station.

Sowerby Bridge also has a good case for more trains. HADRAG argues all York-Blackpool”Northern Connects” should stop there, plus the extra Manchester-Bradford trains due to start in 2019. We believe our ideas are sensible and achievable. And we believe Arriva, Rail North and the other “powers that be”are listening to us.